Meetings of the LHC Insertions Upgrade Working Group (LIUWG)


2007

Meeting No & Link to the minutes

Date

Agenda

Presentations

1. 05.09.2007 Introductory meeting Mandate, Milestones, Members and Organization (R. Ostojic)
2. 27.09.2007 Beam screen and aperture review in LSS and triplet magnets Vacuum stability (V. Baglin), LSS magnet aperture requirements (S. Fartoukh)
3. 18.10.2007 Hardware, layout and optics constraints for Phase I solutions Space constraints for the triplet cryostats (V. Parma), Optics solutions for Phase I (R. De Maria), Beam-screen geometry (V. Baglin)
4. 01.11.2007 Collimation issues Triplet aperture and collimation issues (R. Assmann)
5. 15.11.2007 Cryogenic limitations and heat transfer related constraints for phase I Limits of the present cryogenics in IP1/5 and possible "Phase I" upgrades (L. Tavian), Possibilities of improving the heat transfer from cable to HeII in coil cross-sections (D. Tommasini)
6. 29.11.2007 Report on IR'07 and THERMOMAG workshops, option for resistive D1 Summary of IR'07 workshop (F. Zimmermann), Highlights from THERMOMAG (R. van Weelderen), Option for resistive D1 dipoles (M. Karppinen)
7. 13.12.2007 Powering strategy and quench protection related aspects Powering strategy for the new inner triplets (F. Bordry), Quench protection (K-H. Mess)